The Vila Pouca de Aguiar cluster of 3 projects totalling 300 MVA, will be studied by the TSO REN to have the upgraded infrastructure costs presented in order it can have the TRC (Capacity Reserve Title) which is the Grid Access Permit. (Copyright PV Magazine Spain)